Project Details
This page displays current information for project DEA: 11430324.
Project Information
| Project Identifiers | Project ID: 1000320 DEA: 11430324 EFIS: 1118000102 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-14.6/23.7 |
| Award Date | 08/23/2024 |
| Closeout Date | Not set |
| Work Description | MODIFY ELECTRICAL, CONCRETE PAVEMENT, DRAINAGE AND SIGNS. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/15 SEPARATION TO 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION |
| QA Service Level | 1 (Verified on 09/09/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| arashdeep.pannu@dot.ca.gov | Art Pannu | Resident Engineer | Caltrans RE DB |
| anh.v.ma@dot.ca.gov | Anh Ma | Structural Representative | Caltrans SR DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 80 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-03-26-35 | 03/26/2025 | 03/28/2025 | Quality Assurance | Concrete | View |
| 2025-03-26-5 | 03/26/2025 | 03/26/2025 | Quality Assurance | Aggregate | View |
| 2025-03-26-4 | 03/26/2025 | 03/26/2025 | Quality Assurance | Concrete | View |
| 2025-03-26-3 | 03/26/2025 | 03/26/2025 | Quality Assurance | Concrete | View |
| 2025-03-26-2 | 03/26/2025 | 03/26/2025 | Quality Assurance | Concrete | View |
| 2025-03-25-4 | 03/25/2025 | 03/25/2025 | Quality Assurance | Concrete | View |
| 2025-03-25-3 | 03/25/2025 | 03/25/2025 | Quality Assurance | Concrete | View |
| 2025-03-24-6 | 03/24/2025 | 03/25/2025 | Quality Assurance | Concrete | View |
| 2025-03-21-3 | 03/21/2025 | 03/21/2025 | Quality Assurance | Aggregate | View |
| 2025-03-20-5 | 03/20/2025 | 03/20/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
