Project Details
This page displays current information for project DEA: 081M8504.
Project Information
| Project Identifiers | Project ID: 1000179 DEA: 081M8504 EFIS: 0822000054 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-111-0.0/18.5 |
| Award Date | 05/15/2024 |
| Closeout Date | 01/06/2025 |
| Work Description | RHMA (GAP-GRADED), COLD PLANE AC PVMT, THERMOPLASTIC TRAFFIC STRIPE. |
| Location Description | RIVERSIDE COUNTY AT SALTON SEA FROM IMPERIAL COUNTY LINE TO 0.1 MILE NORTH OF 66TH AVENUE |
| QA Service Level | 1 (Verified on 05/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Khoi.vu@dot.ca.gov | Khoi Vu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 56 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-19-53 | 08/19/2024 | 08/20/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-22-18 | 08/22/2024 | 08/23/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-18-13 | 08/18/2024 | 08/20/2024 | Verification | Asphalt Rubber Binder | View |
| 2024-08-21-38 | 08/21/2024 | 08/22/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-20-36 | 08/20/2024 | 08/22/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-18-9 | 08/18/2024 | 08/20/2024 | Verification | Asphalt Binder | View |
| 2024-08-12-50 | 08/12/2024 | 08/13/2024 | Verification | Asphalt Binder | View |
| 2024-08-18-5 | 08/18/2024 | 08/20/2024 | Verification | Aggregate | View |
| 2024-08-19-15 | 08/19/2024 | 08/20/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-19-7 | 08/19/2024 | 08/20/2024 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
