Project Details

This page displays current information for project DEA: 081C38U4.

Project Information

Project IdentifiersProject ID: 213707
DEA: 081C38U4
EFIS: 0817000196
DIST-CO-RTE-PM08-RIV-10-6.7/R25.1
Award Date11/26/2019
Closeout Date11/01/2023
Work DescriptionRemove concrete pavement and base, and place HMA and JPCP
Location DescriptionROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON.
QA Service Level1 (Verified on 01/09/2020)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
elvira.lenart@dot.ca.govElvira LenartResident EngineerCaltrans RE DB
joshua.fry@dot.ca.govJoshua FryMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 431-440 of 1400 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2021-12-01-2212/01/202112/02/2021Quality AssuranceConcreteView
2021-12-03-3712/03/202112/04/2021Quality AssuranceConcreteView
2021-12-10-512/10/202112/11/2021Quality AssuranceConcreteView
2021-12-08-2712/08/202112/09/2021Quality AssuranceConcreteView
2021-12-01-1912/01/202112/02/2021Quality AssuranceConcreteView
2021-12-01-1612/01/202112/06/2021AuthorizationSMTL TM7 - Epoxy Coated RebarView
2021-11-30-4611/30/202112/01/2021Quality AssuranceConcreteView
2021-12-08-1812/08/202112/08/2021Quality AssuranceAggregateView
2021-11-29-2611/29/202111/30/2021Quality AssuranceConcreteView
2021-12-07-912/07/202112/08/2021Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

68.6%31%CT D08 - Fontana Field Testing Laboratory (68.6%)CT D08 - Fontana Southern Regional Laboratory (31%)CT HQ - QASI Los Angeles Field Office (0.1%)CT HQ - Sacramento Concrete Testing Laboratory (0.1%)CT HQ - Sacramento Structural Materials Testing Laboratory (0.1%)Kwik Bond Polymers (0.1%)Sequoia Consultants (0.1%)

Sample Types

20.8%74.8%Authorization (0.1%)Department Acceptance (20.8%)Per Request (0.4%)Quality Assurance (74.8%)Quality Control (1.7%)Verification (2.2%)

Number of Tests

81.9%17.6%CT D08 - Fontana Field Testing Laboratory (81.9%)CT D08 - Fontana Southern Regional Laboratory (17.6%)CT HQ - Sacramento Concrete Testing Laboratory (0.2%)CT HQ - Sacramento Structural Materials Testing Laboratory (0.1%)Sequoia Consultants (0.1%)

Test Types

9.4%82.6%Authorization (0.1%)Department Acceptance (9.4%)Per Request (0.8%)Quality Assurance (82.6%)Quality Control (0.8%)Verification (6.3%)

Material Types

24%40.1%33.6%Aggregate (24%)Asphalt Binder (1.2%)Asphalt Rubber Binder (0.8%)Concrete (40.1%)Hot Mix Asphalt (33.6%)Polyester (0.1%)Rapid Set (0.1%)SMTL TM7 - Epoxy Coated Rebar (0.2%)

Test Methods

8.1%ASTM C 39 (0.8%)AASHTO T 96 (0.6%)AASHTO T 304 (0.6%)CTM 202 (1%)CTM 217 (0%)AASHTO T 84 (0.6%)AASHTO T 85 (0.6%)AASHTO T 176 (8.1%)CTM 504 (7.1%)CTM 556 (0%)