This page displays current information for project DEA: 07347904.
Project Information
| Project Identifiers | Project ID: 995228 DEA: 07347904 EFIS: 0718000123 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-31.2/41.4 |
| Award Date | 03/07/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE HMA, RHMA, JPCP, ISR, & REPLACE BRIDGE SLABS. |
| Location Description | LOS ANGELES FROM WILSHIRE BOULEVARD UNDERCROSSING TO VICTORY BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 01/22/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| denrick.bautista@dot.ca.gov | Denrick Bautista | Resident Engineer | Caltrans RE DB |
| gon.choi@dot.ca.gov | Gon Choi | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 46 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-23-13 | 08/23/2025 | 08/28/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-08-24-18 | 08/24/2025 | 08/27/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-08-24-17 | 08/24/2025 | 08/26/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-08-24-16 | 08/24/2025 | 08/27/2025 | Verification | Asphalt Binder | View |
| 2025-08-23-12 | 08/23/2025 | 08/28/2025 | Verification | Aggregate | View |
| 2025-08-24-15 | 08/24/2025 | 08/27/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-08-24-14 | 08/24/2025 | 08/27/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-08-24-13 | 08/24/2025 | 08/27/2025 | Verification | Aggregate | View |
| 2025-08-24-11 | 08/24/2025 | 08/26/2025 | Verification | Aggregate | View |
| 2025-08-24-6 | 08/24/2025 | 08/24/2025 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods