Project Details
This page displays current information for project DEA: 07356604.
Project Information
| Project Identifiers | Project ID: 995193 DEA: 07356604 EFIS: 0719000026 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-R10.2/20.2 |
| Award Date | 04/04/2024 |
| Closeout Date | Not set |
| Work Description | LANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY. |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION |
| QA Service Level | 1 (Verified on 10/03/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jerome.g.arabe@dot.ca.gov | Jerome Arabe | Resident Engineer | Caltrans RE DB |
| tien.chu@dot.ca.gov | Tien Chu | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 182 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-23-2 | 08/23/2025 | 08/23/2025 | Acceptance | Aggregate | View |
| 2025-08-23-1 | 08/23/2025 | 08/23/2025 | Acceptance | Aggregate | View |
| 2025-07-27-27 | 07/27/2025 | 07/27/2025 | Acceptance | Concrete | View |
| 2025-08-15-20 | 08/15/2025 | 08/15/2025 | Quality Assurance | Aggregate | View |
| 2025-07-26-6 | 07/26/2025 | 07/26/2025 | Quality Assurance | Aggregate | View |
| 2025-08-09-3 | 08/09/2025 | 08/11/2025 | Acceptance | Aggregate | View |
| 2025-08-09-2 | 08/09/2025 | 08/11/2025 | Acceptance | Aggregate | View |
| 2025-06-26-103 | 06/26/2025 | 06/26/2025 | Quality Assurance | Concrete | View |
| 2025-05-21-121 | 05/21/2025 | 05/30/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-05-20-114 | 05/20/2025 | 05/21/2025 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
