Project Details

This page displays current information for project DEA: 073255U4.

Project Information

Project IdentifiersProject ID: 994966
DEA: 073255U4
EFIS: 0722000129
DIST-CO-RTE-PM07-LA-605-20.2/26
Award Date04/12/2023
Closeout DateNot set
Work DescriptionINDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC
Location DescriptionLOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION
QA Service Level1 (Verified on 07/13/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
steven.taing@dot.ca.govSteven TaingResident EngineerCaltrans RE DB
keivan.hassan@dot.ca.govKeivan HassanMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 31-40 of 71 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2024-06-30-2206/30/202406/23/2024Quality AssuranceConcreteView
2024-06-08-1406/08/202406/08/2024Quality AssuranceConcreteView
2024-06-22-1106/22/202406/22/2024Quality AssuranceConcreteView
2024-06-21-8706/21/202406/21/2024Quality AssuranceConcreteView
2024-06-08-1306/08/202406/08/2024Quality AssuranceConcreteView
2024-06-08-1206/08/202406/08/2024Quality AssuranceConcreteView
2024-06-09-2906/09/202406/09/2024Quality AssuranceAggregateView
2024-06-21-7906/21/202406/25/2024AcceptanceAggregateView
2024-06-09-2806/09/202406/09/2024Quality AssuranceConcreteView
2024-06-09-2706/09/202406/09/2024Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

80.3%15.5%Alta Vista Solutions - Whittier (80.3%)CT D07 - Materials Field Laboratory, Unit 1953 (15.5%)CT D07 - Plant Services (4.2%)

Sample Types

19.7%80.3%Acceptance (19.7%)Quality Assurance (80.3%)

Number of Tests

76.4%12.9%10.7%Alta Vista Solutions - Whittier (76.4%)CT D07 - Materials Field Laboratory, Unit 1953 (12.9%)CT D07 - Plant Services (10.7%)

Test Types

23.6%76.4%Acceptance (23.6%)Quality Assurance (76.4%)

Material Types

56.3%33.8%9.9%Aggregate (56.3%)Concrete (33.8%)Soil (9.9%)

Test Methods

30%30.7%14.3%CTM 202 (4.3%)CTM 217 (2.1%)CTM 524 (6.4%)CTM 226 (2.1%)CTM 227 (2.1%)CTM 216 (30%)CTM 231 (30.7%)CTM 557 (14.3%)CTM 521 (7.9%)