Project Details
This page displays current information for project DEA: 040Y3004.
Project Information
| Project Identifiers | Project ID: 994731 DEA: 040Y3004 EFIS: 0422000265 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-92-R10.4/R12.0 |
| Award Date | 06/21/2023 |
| Closeout Date | 03/04/2024 |
| Work Description | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G. |
| Location Description | SAN MATEO COUNTY IN AND NEAR SAN MATEO FROM 0.2 MILE WEST OF ALAMEDA DE LAS PULGAS OVERCROSSING TO 92/101 SEPARATION |
| QA Service Level | 1 (Verified on 05/09/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
Displaying 31-39 of 39 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-08-24-29 | 08/24/2023 | 08/25/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-23-59 | 08/23/2023 | 08/24/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-23-58 | 08/23/2023 | 08/24/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-22-32 | 08/22/2023 | 08/23/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-21-32 | 08/21/2023 | 08/21/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-22-29 | 08/22/2023 | 08/23/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-21-30 | 08/21/2023 | 08/21/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-21-24 | 08/21/2023 | 08/21/2023 | Production Start-Up | Hot Mix Asphalt | View |
| 2023-08-21-22 | 08/21/2023 | 08/21/2023 | Production Start-Up | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
