Project Details
This page displays current information for project DEA: 120H0474.
Project Information
| Project Identifiers | Project ID: 993153 DEA: 120H0474 EFIS: 1212000053 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-241-27.8/38.0 |
| Award Date | 10/21/2021 |
| Closeout Date | 06/18/2025 |
| Work Description | PLACE HMA AND PERFORATED PLASTIC PIPE UNDERDRAIN. |
| Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF ROUTE 133 TO 0.5 MILE SOUTH OF ROUTE 91 |
| QA Service Level | 1 (Verified on 08/02/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mohamad.yacoub@dot.ca.gov | Mohamad Yacoub | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 82 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-11-08-88 | 11/08/2023 | 11/08/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-11-07-96 | 11/07/2023 | 11/07/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-29-9 | 10/29/2023 | 10/29/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-26-89 | 10/26/2023 | 10/26/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-25-62 | 10/25/2023 | 10/25/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-24-87 | 10/24/2023 | 10/24/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-23-74 | 10/23/2023 | 10/23/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-22-4 | 10/22/2023 | 10/22/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-19-36 | 10/19/2023 | 10/19/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-18-42 | 10/18/2023 | 10/18/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
