Project Details
This page displays current information for project DEA: 051G9704.
Project Information
| Project Identifiers | Project ID: 993150 DEA: 051G9704 EFIS: 0516000008 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-135-11.7/17.8 |
| Award Date | 09/27/2021 |
| Closeout Date | 03/28/2023 |
| Work Description | COLD PLANE, OVERLAY ROADWAY WITH RHMA (GAP GRADED) AND ADA CURB RAMPS. |
| Location Description | SANTA BARBARA COUNTY IN AND NEAR SANTA MARIA FROM LAKEVIEW ROAD TO NORTH SANTA MARIA CONNECTOR |
| QA Service Level | 1 (Verified on 08/09/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Thomas.Petersen@dot.ca.gov | Thomas Petersen | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 46 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-05-23-10 | 05/23/2022 | 05/23/2022 | Verification | Aggregate | View |
| 2022-05-05-46 | 05/05/2022 | 05/09/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-05-04-46 | 05/04/2022 | 05/05/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-05-04-45 | 05/04/2022 | 05/05/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-05-03-45 | 05/03/2022 | 05/04/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-05-03-44 | 05/03/2022 | 05/04/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-04-27-39 | 04/27/2022 | 05/27/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-04-27-38 | 04/27/2022 | 04/26/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-04-27-37 | 04/27/2022 | 05/30/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-04-26-53 | 04/26/2022 | 04/27/2022 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
