Project Details
This page displays current information for project DEA: 080R1424.
Project Information
| Project Identifiers | Project ID: 215050 DEA: 080R1424 EFIS: 0815000201 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R125.0/R154.6 |
| Award Date | 08/26/2020 |
| Closeout Date | 11/01/2022 |
| Work Description | ROADWAY EXCAVATION, IMPORT BORROW AND REGRADE THE MEDIAN SLOPE. |
| Location Description | SAN BERNARDINO COUNTY FROM 4.5 MILES EAST OF HOMER WASH BRIDGE TO ARIZONA STATE LINE |
| QA Service Level | 1 (Verified on 06/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| darcy.davis@dot.ca.gov | Darcy Davis | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 40 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-08-16-62 | 08/16/2021 | 08/16/2021 | Quality Control | Aggregate | View |
| 2021-10-07-24 | 10/07/2021 | 10/07/2021 | Quality Control | Aggregate | View |
| 2021-09-28-42 | 09/28/2021 | 09/29/2021 | Quality Control | Aggregate | View |
| 2021-08-30-53 | 08/30/2021 | 08/31/2021 | Quality Control | Concrete | View |
| 2021-08-16-61 | 08/16/2021 | 08/17/2021 | Quality Control | Concrete | View |
| 2021-09-28-11 | 09/28/2021 | 09/28/2021 | Quality Assurance | Aggregate | View |
| 2021-08-30-11 | 08/30/2021 | 08/30/2021 | Quality Control | Aggregate | View |
| 2021-07-26-41 | 07/26/2021 | 07/27/2021 | Quality Control | Concrete | View |
| 2021-07-26-3 | 07/26/2021 | 07/26/2021 | Quality Control | Aggregate | View |
| 2021-07-22-23 | 07/22/2021 | 07/22/2021 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
