Project Details
This page displays current information for project DEA: 030F2854.
Project Information
Project Identifiers | Project ID: 214680 DEA: 030F2854 EFIS: 0319000205 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.1/9.4 |
Award Date | 04/06/2020 |
Closeout Date | 10/30/2020 |
Work Description | Construct the temporary bridge superstructures, adjacent paving and pave temporary alignment |
Location Description | Not set |
QA Service Level | 1 (Verified on 03/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 42 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-02-28-8 | 02/28/2020 | 02/29/2020 | Quality Control | Concrete | View |
2020-02-27-24 | 02/27/2020 | 02/28/2020 | Quality Control | Concrete | View |
2020-02-26-8 | 02/26/2020 | 02/27/2020 | Quality Control | Concrete | View |
2020-02-25-16 | 02/25/2020 | 02/26/2020 | Quality Control | Concrete | View |
2020-02-24-44 | 02/24/2020 | 02/25/2020 | Quality Control | Concrete | View |
2020-02-21-7 | 02/21/2020 | 02/22/2020 | Quality Control | Concrete | View |
2020-02-20-25 | 02/20/2020 | 02/21/2020 | Quality Control | Concrete | View |
2020-02-20-24 | 02/20/2020 | 02/21/2020 | Quality Control | Concrete | View |
2020-04-09-15 | 04/09/2020 | 04/10/2020 | Quality Control | Concrete | View |
2020-04-13-1 | 04/13/2020 | 04/14/2020 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods