Project Details
This page displays current information for project DEA: 042640F4.
Project Information
| Project Identifiers | Project ID: 210673 DEA: 042640F4 EFIS: 0400020132 COOP: 042308A3 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-- |
| Award Date | 08/08/2019 |
| Closeout Date | 02/16/2024 |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| gina.choi@dot.ca.gov | Gina Choi | Resident Engineer | Caltrans RE DB |
| brian.f.beaudoin@dot.ca.gov | Brian Beaudoin | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 342 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-04-09-15 | 04/09/2022 | 04/11/2022 | Quality Assurance | Concrete | View |
| 2022-04-06-3 | 04/06/2022 | 04/07/2022 | Quality Assurance | Concrete | View |
| 2022-04-02-1 | 04/02/2022 | 04/02/2022 | Quality Assurance | Concrete | View |
| 2022-03-30-3 | 03/30/2022 | 03/30/2022 | Quality Assurance | Concrete | View |
| 2022-03-26-8 | 03/26/2022 | 03/30/2022 | Quality Assurance | Concrete | View |
| 2022-03-26-7 | 03/26/2022 | 03/30/2022 | Quality Assurance | Concrete | View |
| 2022-03-25-10 | 03/25/2022 | 03/25/2022 | Quality Assurance | Concrete | View |
| 2022-03-21-28 | 03/21/2022 | 03/21/2022 | Quality Assurance | Concrete | View |
| 2022-03-24-4 | 03/24/2022 | 03/24/2022 | Quality Assurance | Concrete | View |
| 2022-03-10-15 | 03/10/2022 | 03/15/2022 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-318-2020-283 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 09/02/2020 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
