Project Details
This page displays current information for project DEA: 050N74U4.
Project Information
| Project Identifiers | Project ID: 994864 DEA: 050N74U4 EFIS: 0522000025 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-9.9/10.6 |
| Award Date | 07/10/2023 |
| Closeout Date | Not set |
| Work Description | SB 101 4D North San Ysidro to Olive Mill |
| Location Description | In Santa Barbara County in and near Santa Barbara from 0.1 mile south of San Ysidro Road Overcrossing to 0.1 north of Olive Mill Road Overcrossing |
| QA Service Level | 1 (Verified on 08/21/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| taylor.merlo@dot.ca.gov | Taylor Merlo | Resident Engineer | Caltrans RE DB |
| emiliano.berntsen@dot.ca.gov | Emiliano Berntsen | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 381-390 of 421 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-07-27-103 | 07/27/2023 | 07/28/2023 | Quality Control | Concrete | View |
| 2023-07-25-96 | 07/25/2023 | 07/25/2023 | Quality Control | Concrete | View |
| 2023-07-20-103 | 07/20/2023 | 07/21/2023 | Quality Control | Concrete | View |
| 2023-08-16-112 | 08/16/2023 | 08/16/2023 | Quality Control | Aggregate | View |
| 2023-08-09-89 | 08/09/2023 | 08/09/2023 | Quality Control | Aggregate | View |
| 2023-08-08-81 | 08/08/2023 | 08/08/2023 | Quality Control | Aggregate | View |
| 2023-08-04-105 | 08/04/2023 | 08/04/2023 | Quality Control | Aggregate | View |
| 2023-07-27-101 | 07/27/2023 | 07/27/2023 | Quality Control | Aggregate | View |
| 2023-06-30-81 | 06/30/2023 | 07/01/2023 | Quality Control | Concrete | View |
| 2023-07-25-95 | 07/25/2023 | 07/25/2023 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
