Project Details
This page displays current information for project DEA: 044A1304.
Project Information
| Project Identifiers | Project ID: 212470 DEA: 044A1304 EFIS: 0400001106 COOP: 042718 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-101-18.5/18.5 |
| Award Date | 11/17/2023 |
| Closeout Date | Not set |
| Work Description | CONSISTS OF MODIFICATION AND RECONSTRUCTION OF THE EXISTING US 101/HEARN AVENUE INTERCHANGE IN SONOMA COUNTY, INCLUDING REPLACING THE EXISTING TWO-LANE HEARN AVENUE OVERCROSSING WITH A NEW OVERCROSSING, AND MODIFYING THE SOUTHBOUND OFF-RAMP IN CITY |
| Location Description | IN SONOMA COUNTY. |
| QA Service Level | 1 (Verified on 09/23/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 351-360 of 360 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-26-29 | 07/26/2024 | 07/26/2024 | Quality Control | Concrete | View |
| 2024-07-25-29 | 07/25/2024 | 07/25/2024 | Quality Control | Concrete | View |
| 2024-07-24-43 | 07/24/2024 | 07/24/2024 | Quality Control | Concrete | View |
| 2024-07-23-43 | 07/23/2024 | 07/23/2024 | Quality Control | Concrete | View |
| 2024-07-22-27 | 07/22/2024 | 07/22/2024 | Quality Control | Concrete | View |
| 2024-07-19-27 | 07/19/2024 | 07/19/2024 | Quality Control | Concrete | View |
| 2024-07-18-37 | 07/18/2024 | 07/18/2024 | Quality Control | Concrete | View |
| 2024-07-17-7 | 07/17/2024 | 07/17/2024 | Quality Control | SMTL TM5 - Welded Hoops | View |
| 2024-07-17-2 | 07/17/2024 | 07/19/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-07-02-83 | 07/02/2024 | 07/02/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-2 of 2 results.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-318-2025-73 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 10/24/2025 | View | |
| JMF3511-318-2025-47 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 07/22/2025 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
