Project Details
This page displays current information for project DEA: 081C08U4.
Project Information
| Project Identifiers | Project ID: 994586 DEA: 081C08U4 EFIS: 0822000142 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-R134.0/R156.5 |
| Award Date | 06/22/2023 |
| Closeout Date | Not set |
| Work Description | PLACE HMA (TYPE A), JPCP, IMPORTED BORROW, ROADWAY EXCAVATION & CL2 AB |
| Location Description | RIVERSIDE COUNTY FROM 1.1 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE |
| QA Service Level | 1 (Verified on 08/02/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Ryan.Luis.Espoy@dot.ca.gov | Ryan Espoy (cc on Reports) | Resident Engineer | Caltrans RE DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 321-330 of 411 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-02-05-7 | 02/05/2025 | 02/07/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-01-27-21 | 01/27/2025 | 02/03/2025 | Verification | Asphalt Binder | View |
| 2025-01-27-20 | 01/27/2025 | 02/03/2025 | Verification | Aggregate | View |
| 2025-01-27-19 | 01/27/2025 | 02/03/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-01-31-8 | 01/31/2025 | 02/03/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-01-30-25 | 01/30/2025 | 02/03/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-01-29-8 | 01/29/2025 | 02/03/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-01-28-15 | 01/28/2025 | 02/03/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-01-27-17 | 01/27/2025 | 02/03/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-01-03-28 | 01/03/2025 | 01/03/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
