Project Details
This page displays current information for project DEA: 120J34U4.
Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| vvaldovinos@fountainheadcorp.com | Victor Valdovinos | Resident Engineer | Caltrans RE DB |
| Yong.Gyun.Park@dot.ca.gov | Yong Gyun Park | Structural Representative | Caltrans SR DB |
| eric.tsang@dot.ca.gov | Eric Tsang | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 321-330 of 1647 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-05-07-123 | 05/07/2025 | 05/08/2025 | Quality Control | Aggregate | View |
| 2025-05-06-98 | 05/06/2025 | 05/07/2025 | Quality Control | Concrete | View |
| 2025-05-06-97 | 05/06/2025 | 05/07/2025 | Quality Control | Aggregate | View |
| 2025-05-21-112 | 05/21/2025 | 05/22/2025 | Quality Control | Concrete | View |
| 2025-05-06-94 | 05/06/2025 | 05/07/2025 | Quality Control | Concrete | View |
| 2025-05-02-62 | 05/02/2025 | 05/03/2025 | Quality Control | Concrete | View |
| 2025-05-01-94 | 05/01/2025 | 05/02/2025 | Quality Control | Concrete | View |
| 2025-05-01-93 | 05/01/2025 | 05/02/2025 | Quality Control | Concrete | View |
| 2025-04-25-44 | 04/25/2025 | 04/26/2025 | Quality Control | Concrete | View |
| 2025-04-25-43 | 04/25/2025 | 04/26/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
