Project Details
This page displays current information for project DEA: 081J9104.
Project Information
Project Identifiers | Project ID: 995061 DEA: 081J9104 EFIS: 0818000135 |
---|---|
DIST-CO-RTE-PM | 08-RIV,SBD-10,15,60,62,91,etc.-Var |
Award Date | 10/11/2023 |
Closeout Date | Not set |
Work Description | MODIFYING CMS SYSTEMS, SIGN FOUNDATION AND SIGN STRUCTURE. |
Location Description | RIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 08/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
george.salloum@dot.ca.gov | George Salloum | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 35 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-06-13-97 | 06/13/2024 | 06/13/2024 | Quality Control | Aggregate | View |
2024-06-13-96 | 06/13/2024 | 06/13/2024 | Acceptance | Aggregate | View |
2024-06-07-87 | 06/07/2024 | 06/07/2024 | Quality Control | Aggregate | View |
2024-06-06-106 | 06/06/2024 | 06/06/2024 | Acceptance | Aggregate | View |
2024-06-05-121 | 06/05/2024 | 06/05/2024 | Acceptance | Aggregate | View |
2024-05-29-91 | 05/29/2024 | 05/29/2024 | Acceptance | Aggregate | View |
2024-06-13-60 | 06/13/2024 | 06/14/2024 | Quality Assurance | Concrete | View |
2024-06-06-69 | 06/06/2024 | 06/06/2024 | Quality Control | Aggregate | View |
2024-06-07-37 | 06/07/2024 | 06/10/2024 | Quality Assurance | Concrete | View |
2024-06-05-64 | 06/05/2024 | 06/05/2024 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods