Project Details

This page displays current information for project DEA: 07390204.

Project Information

Project IdentifiersProject ID: 994675
DEA: 07390204
EFIS: 0722000334
DIST-CO-RTE-PM07-LA-47-0.4 / 2.1
Award Date01/24/2025
Closeout DateNot set
Work DescriptionBridge deck replacement with lightweight precast deck panels ultra high performance concrete. Also includes: replacement of seismic sensors, upgrades to median barrier, railings, fences and guard rails. New finger joints.
Location DescriptionRTE 47 between Terminal Island and San Pedro PM 0.4/2.1
QA Service Level1 (Verified on 08/07/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
samuel.gallardo@dot.ca.govSam GallardoResident EngineerCaltrans RE DB
sami.deeb@dot.ca.govSami DeebStructural RepresentativeCaltrans SR DB
james.devey@dot.ca.govJames DeveyMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 21-30 of 122 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2026-07-07-707/07/202607/14/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-07-07-407/07/202607/20/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-06-22-206/22/202606/25/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-06-22-106/22/202606/25/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-06-16-6006/16/202606/22/2026Quality AssuranceSMTL TM4 - Prestressing StrandView
2026-06-04-5306/04/202605/20/2026Quality AssuranceConcreteView
2026-06-04-5106/04/202605/06/2026Quality AssuranceConcreteView
2026-06-04-406/04/202606/11/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-06-04-106/04/202606/04/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-05-20-4805/20/202605/21/2026Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
073902042026-07-13-1307/13/2026View
073902042026-07-10-707/10/2026View
073902042026-07-10-707/10/2026View

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods