Project Details
This page displays current information for project DEA: 033F0704.
Project Information
| Project Identifiers | Project ID: 994673 DEA: 033F0704 EFIS: 0312000054 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-51-2.0/3.5 |
| Award Date | 08/17/2023 |
| Closeout Date | Not set |
| Work Description | American River Bridge Rehabilitation |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 05/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| john.ruzic@dot.ca.gov | John Ruzic | Resident Engineer | Caltrans RE DB |
| pha.tran@dot.ca.gov | Pha Tran | Structural Representative | Caltrans SR DB |
| mihai.hantelmann@dot.ca.gov | Mihai Hantelmann | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 124 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-04-22-7 | 04/22/2025 | 04/25/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-04-01-1 | 04/01/2025 | 04/01/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2025-02-21-1 | 02/21/2025 | 03/17/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2024-12-06-52 | 12/06/2024 | 12/13/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-12-03-78 | 12/03/2024 | 12/13/2024 | Production Start-Up | Hot Mix Asphalt | View |
| 2024-12-05-83 | 12/05/2024 | 12/13/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-01-17-3 | 01/17/2025 | 01/28/2025 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2024-12-06-29 | 12/06/2024 | 12/11/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-12-05-51 | 12/05/2024 | 12/11/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-12-04-56 | 12/04/2024 | 12/11/2024 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
