Project Details
This page displays current information for project DEA: 07330304.
Project Information
| Project Identifiers | Project ID: 994396 DEA: 07330304 EFIS: 0716000213 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-22.0/30.8 |
| Award Date | 10/09/2023 |
| Closeout Date | 09/25/2025 |
| Work Description | CONSTRUCT CONCRETE BARRIER AND STRUCTURAL CONCRETE BARRIER SLAB. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.6 MILE EAST OF ROUTE 710/10 SEPARATION TO 0.3 MILE WEST OF ROUTE 10/605 SEPARATION |
| QA Service Level | 1 (Verified on 07/24/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| edgar.herrera@dot.ca.gov | Edgar Herrera | Resident Engineer | Caltrans RE DB |
| ryan.ramos@dot.ca.gov | Ryan Ramos | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 51 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-26-132 | 09/26/2024 | 09/26/2024 | Quality Control | Concrete | View |
| 2024-09-22-24 | 09/22/2024 | 09/22/2024 | Quality Control | Concrete | View |
| 2024-09-22-23 | 09/22/2024 | 09/22/2024 | Quality Control | Concrete | View |
| 2024-09-07-7 | 09/07/2024 | 09/07/2024 | Quality Control | Concrete | View |
| 2024-05-13-113 | 05/13/2024 | 05/13/2024 | Quality Control | Concrete | View |
| 2024-06-19-162 | 06/19/2024 | 06/19/2024 | Quality Control | Concrete | View |
| 2024-05-09-108 | 05/09/2024 | 05/09/2024 | Quality Control | Concrete | View |
| 2024-02-29-71 | 02/29/2024 | 02/29/2024 | Quality Control | Concrete | View |
| 2025-05-11-11 | 05/11/2025 | 05/11/2025 | Quality Assurance | Concrete | View |
| 2025-05-04-14 | 05/04/2025 | 05/04/2025 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
