Project Details
This page displays current information for project DEA: 040K6304.
Project Information
| Project Identifiers | Project ID: 994378 DEA: 040K6304 EFIS: 0416000111 |
|---|---|
| DIST-CO-RTE-PM | 04-NAP-29-16.4/19.0 |
| Award Date | 06/27/2023 |
| Closeout Date | Not set |
| Work Description | BRIDGE RAIL REPLACEMENT AND SHOULDER WIDENING. |
| Location Description | NAPA COUNTY NEAR YOUNTVILLE AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF DRY CREEK BRIDGE TO 0.1 MILE NORTH OF CALIFORNIA DRIVE UNDERCROSSIG |
| QA Service Level | 1 (Verified on 10/27/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| danilo.patenia@dot.ca.gov | Danilo Patenia | Resident Engineer | Caltrans RE DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 37 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-11-116 | 07/11/2024 | 07/11/2024 | Quality Control | Concrete | View |
| 2024-07-10-139 | 07/10/2024 | 07/10/2024 | Quality Control | Concrete | View |
| 2024-07-11-94 | 07/11/2024 | 07/12/2024 | Quality Assurance | Aggregate | View |
| 2024-07-10-103 | 07/10/2024 | 07/11/2024 | Quality Assurance | Aggregate | View |
| 2024-07-11-70 | 07/11/2024 | 07/16/2024 | Quality Assurance | Concrete | View |
| 2024-07-10-66 | 07/10/2024 | 07/16/2024 | Quality Assurance | Concrete | View |
| 2024-06-04-106 | 06/04/2024 | 06/04/2024 | Quality Control | Concrete | View |
| 2024-06-04-69 | 06/04/2024 | 06/12/2024 | Quality Assurance | Concrete | View |
| 2024-05-29-67 | 05/29/2024 | 05/29/2024 | Quality Assurance | Concrete | View |
| 2024-02-16-25 | 02/16/2024 | 02/28/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
