Project Details
This page displays current information for project DEA: 033J3304.
Project Information
| Project Identifiers | Project ID: 994358 DEA: 033J3304 EFIS: 0322000251 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-12-0/0.5 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | MMBN Project. Replace backup drive system, replace lift span deck, install hydraulic barrier system and new generator, replace electrical control system, install new traffic gates and elevators, traffic control, |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 10/25/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ephrem.teweldeberhan@dot.ca.gov | Ephrem Tweldeberham | Resident Engineer | Caltrans RE DB |
| rusty.danna@dot.ca.gov | Rusty D'Anna | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 33 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-04-28-5 | 04/28/2025 | 05/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-04-27-2 | 04/27/2025 | 03/27/2025 | Quality Assurance | Concrete | View |
| 2025-04-27-1 | 04/27/2025 | 03/27/2025 | Quality Assurance | Concrete | View |
| 2025-04-13-2 | 04/13/2025 | 04/13/2025 | Quality Assurance | Concrete | View |
| 2025-04-13-1 | 04/13/2025 | 04/13/2025 | Quality Assurance | Concrete | View |
| 2025-03-30-2 | 03/30/2025 | 03/30/2025 | Quality Assurance | Concrete | View |
| 2025-03-30-1 | 03/30/2025 | 03/30/2025 | Quality Assurance | Concrete | View |
| 2025-03-18-5 | 03/18/2025 | 03/24/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-03-18-4 | 03/18/2025 | 03/18/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2023-01-26-35 | 01/26/2023 | 01/27/2023 | Per Request | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
