Project Details
This page displays current information for project DEA: 07353304.
Project Information
Project Identifiers | Project ID: 993807 DEA: 07353304 EFIS: 0718000272 |
---|---|
DIST-CO-RTE-PM | 07-LA-110-23.1 |
Award Date | 11/03/2022 |
Closeout Date | 09/24/2024 |
Work Description | REPLACE BRIDGE RAILING WITH CONCRETE BARRIER. AND UPGRADE LIGHTING. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT THIRD STREET OVERCROSSING |
QA Service Level | 1 (Verified on 05/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Edgar.Herrera@dot.ca.gov | Edgar Herrera | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 39 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-07-28-48 | 07/28/2023 | Quality Assurance | Concrete | View | |
2023-07-27-45 | 07/27/2023 | 07/27/2023 | Department Acceptance | Soil | View |
2023-07-27-44 | 07/27/2023 | 07/27/2023 | Department Acceptance | Soil | View |
2023-07-24-7 | 07/24/2023 | 07/24/2023 | Department Acceptance | Soil | View |
2023-05-23-80 | 05/23/2023 | 05/24/2023 | Quality Control | Aggregate | View |
2023-05-19-93 | 05/19/2023 | 05/19/2023 | Quality Control | Aggregate | View |
2023-05-11-99 | 05/11/2023 | 05/12/2023 | Quality Control | Concrete | View |
2023-03-09-46 | 03/09/2023 | 03/09/2023 | Quality Control | Concrete | View |
2023-05-11-91 | 05/11/2023 | 05/30/2023 | Department Acceptance | Concrete | View |
2023-05-11-77 | 05/11/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods