Project Details
This page displays current information for project DEA: 020H5704.
Project Information
Project Identifiers | Project ID: 993580 DEA: 020H5704 EFIS: 0215000052 |
---|---|
DIST-CO-RTE-PM | 02-MOD-139-R3.5/30.3 |
Award Date | 11/10/2022 |
Closeout Date | 05/06/2024 |
Work Description | MODOC 139 DRAINAGE - DRAINAGE REHABILITATION |
Location Description | IN MODOC COUNTY AT VARIOUS LOCATIONS FROM 1.2 MILES NORTH OF HOWARDS GULCH BRIDGE TO 0.1 MILE SOUTH OF CLEAR LAKE ROAD. |
QA Service Level | 1 (Verified on 03/02/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joel.gasik@dot.ca.gov | Joel Gasik | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 60 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-09-13 | 05/09/2023 | 05/09/2023 | Quality Control | Concrete | View |
2023-05-08-3 | 05/08/2023 | 05/08/2023 | Quality Control | Concrete | View |
2023-05-05-2 | 05/05/2023 | 05/05/2023 | Quality Control | Concrete | View |
2023-05-04-6 | 05/04/2023 | 05/04/2023 | Quality Control | Concrete | View |
2023-05-03-10 | 05/03/2023 | 05/03/2023 | Quality Control | Concrete | View |
2023-05-02-33 | 05/02/2023 | 05/02/2023 | Quality Control | Concrete | View |
2023-05-01-8 | 05/01/2023 | 05/01/2023 | Quality Control | Concrete | View |
2023-04-28-11 | 04/28/2023 | 04/28/2023 | Quality Control | Concrete | View |
2023-04-27-11 | 04/27/2023 | 04/27/2023 | Quality Control | Concrete | View |
2023-04-26-17 | 04/26/2023 | 04/26/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods