Project Details
This page displays current information for project DEA: 07327304.
Project Information
| Project Identifiers | Project ID: 993527 DEA: 07327304 EFIS: 0716000126 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-103-0.1 |
| Award Date | 04/21/2022 |
| Closeout Date | Not set |
| Work Description | INSTALL PUMP PLANT EQUIPMENT AND DRAINAGE SYSTEM. |
| Location Description | THE CITY AND COUNTY OF LOS ANGELES AT HENRY FORD AVENUE OFF-RAMP |
| QA Service Level | 1 (Verified on 05/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| steven.z.zaw@dot.ca.gov | Steven Zaw | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 30 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-30-109 | 07/30/2024 | 07/30/2024 | Quality Assurance | Aggregate | View |
| 2024-08-06-85 | 08/06/2024 | 08/07/2024 | Acceptance | Concrete | View |
| 2024-07-18-80 | 07/18/2024 | 07/19/2024 | Acceptance | Concrete | View |
| 2024-08-02-6 | 08/02/2024 | 08/02/2024 | Acceptance | Soil | View |
| 2024-06-27-59 | 06/27/2024 | 06/28/2024 | Acceptance | Concrete | View |
| 2024-04-30-76 | 04/30/2024 | 05/01/2024 | Acceptance | Concrete | View |
| 2024-05-23-58 | 05/23/2024 | 05/24/2024 | Acceptance | Concrete | View |
| 2024-05-08-79 | 05/08/2024 | 05/09/2024 | Acceptance | Concrete | View |
| 2024-05-08-61 | 05/08/2024 | 05/09/2024 | Department Acceptance | Concrete | View |
| 2023-06-16-15 | 06/16/2023 | 06/16/2023 | Department Acceptance | Soil | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
