Project Details
This page displays current information for project DEA: 120R2004.
Project Information
Project Identifiers | Project ID: 993511 DEA: 120R2004 EFIS: 1218000065 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-0.0/2.0 |
Award Date | 04/14/2022 |
Closeout Date | 06/19/2024 |
Work Description | PLACE PRECAST CONCRETE PAVEMENT AND REPLACE CONCRETE SLAB. |
Location Description | ORANGE COUNTY IN SAN CLEMENTE FROM ORANGE COUNTY LINE TO 0.4 MILE NORTH OF EL CAMINO REAL UNDERCROSSING |
QA Service Level | 1 (Verified on 01/24/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mona.shahidi@dot.ca.gov | Mona Shahidi | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 57 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-12-27-25 | 12/27/2022 | 12/26/2022 | Quality Control | Concrete | View |
2022-12-23-19 | 12/23/2022 | 12/26/2022 | Quality Control | Concrete | View |
2022-12-22-59 | 12/22/2022 | 12/23/2022 | Quality Control | Concrete | View |
2022-12-21-83 | 12/21/2022 | 12/22/2022 | Quality Control | Concrete | View |
2022-12-20-55 | 12/20/2022 | 12/21/2022 | Quality Control | Concrete | View |
2022-12-19-44 | 12/19/2022 | 12/20/2022 | Quality Control | Concrete | View |
2022-12-15-42 | 12/15/2022 | 12/16/2022 | Quality Control | Concrete | View |
2022-12-14-27 | 12/14/2022 | 12/15/2022 | Quality Control | Concrete | View |
2022-12-09-45 | 12/09/2022 | 12/12/2022 | Quality Control | Concrete | View |
2022-12-08-50 | 12/08/2022 | 12/09/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods