Project Details
This page displays current information for project DEA: 050A0904.
Project Information
| Project Identifiers | Project ID: 993169 DEA: 050A0904 EFIS: 0513000028 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-156-R1.4/R2.0 |
| Award Date | 12/14/2021 |
| Closeout Date | 07/31/2024 |
| Work Description | WIDEN REINFORCED STRUCTURAL CONCRETE BRIDGE & REPLACE BRIDGE RAILING. |
| Location Description | MONTEREY COUNTY IN AND NEAR CASTROVILLE FROM 0.3 MILE EAST OF ROUTE 156/183 SEPARATION TO 0.2 MILE EAST OF CASTROVILLE BOULEVARD |
| QA Service Level | 1 (Verified on 08/17/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| david.hopper@dot.ca.gov | David Hopper | Resident Engineer | Caltrans RE DB |
| dean.russu@dot.ca.gov | Dean Russu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 41 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-04-03-8 | 04/03/2023 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2023-04-03-7 | 04/03/2023 | Quality Assurance | SMTL TM5 - Headed Bars | View | |
| 2023-04-03-6 | 04/03/2023 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2023-04-03-5 | 04/03/2023 | Quality Assurance | SMTL TM5 - Headed Bars | View | |
| 2023-04-03-4 | 04/03/2023 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2023-04-03-3 | 04/03/2023 | Quality Assurance | SMTL TM5 - Headed Bars | View | |
| 2023-04-03-2 | 04/03/2023 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2023-04-03-1 | 04/03/2023 | Quality Assurance | SMTL TM5 - Headed Bars | View | |
| 2023-02-16-36 | 02/16/2023 | 02/17/2023 | Quality Assurance | Concrete | View |
| 2023-02-14-38 | 02/14/2023 | 02/15/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
