Project Details
This page displays current information for project DEA: 07319104.
Project Information
| Project Identifiers | Project ID: 993162 DEA: 07319104 EFIS: 0716000017 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-91-R11.8 |
| Award Date | 02/10/2022 |
| Closeout Date | 01/11/2024 |
| Work Description | ADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP. |
| Location Description | LOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR |
| QA Service Level | 1 (Verified on 11/30/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 34 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-09-08-59 | 09/08/2022 | 09/09/2022 | Department Acceptance | Concrete | View |
| 2022-08-17-92 | 08/17/2022 | 08/18/2022 | Department Acceptance | Concrete | View |
| 2022-08-17-91 | 08/17/2022 | 08/18/2022 | Department Acceptance | Concrete | View |
| 2022-08-17-84 | 08/17/2022 | 08/25/2022 | Department Acceptance | Aggregate | View |
| 2022-08-16-59 | 08/16/2022 | 09/23/2022 | Department Acceptance | Aggregate | View |
| 2022-08-30-42 | 08/30/2022 | 08/31/2022 | Quality Assurance | Concrete | View |
| 2022-08-26-26 | 08/26/2022 | 08/27/2022 | Quality Assurance | Concrete | View |
| 2022-07-24-9 | 07/24/2022 | 07/25/2022 | Department Acceptance | Concrete | View |
| 2022-07-24-8 | 07/24/2022 | 07/25/2022 | Department Acceptance | Concrete | View |
| 2022-07-24-7 | 07/24/2022 | 07/25/2022 | Department Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
