Project Details
This page displays current information for project DEA: 043G4884.
Project Information
| Project Identifiers | Project ID: 215649 DEA: 043G4884 EFIS: 0412000088 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-92-R14.4/R18.8 |
| Award Date | 09/01/2022 |
| Closeout Date | 10/09/2024 |
| Work Description | CLEAN AND PAINT STEEL BRIDGE TOWERS, REPLACE HIGH STRENGTH BOLTS. |
| Location Description | SAN MATEO COUNTY IN FOSTER CITY FROM SAN MATEO-HAYWARD BRIDGE TO ALAMEDA COUNTY LINE |
| QA Service Level | 1 (Verified on 03/29/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kingston.atako@dot.ca.gov | Kingston Atako | Resident Engineer | Caltrans RE DB |
| stanley.ku@hdrinc.com | Stanley Ku | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-22 of 22 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-01-27-1 | 01/27/2023 | 01/31/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2022-12-13-4 | 12/13/2022 | 12/15/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
