Project Details
This page displays current information for project DEA: 01436404.
Project Information
| Project Identifiers | Project ID: 215620 DEA: 01436404 EFIS: 0100000193 |
|---|---|
| DIST-CO-RTE-PM | 01-DN-101-35.8/36.5 |
| Award Date | 07/11/2022 |
| Closeout Date | Not set |
| Work Description | Dr. Fine Bridge Replacement |
| Location Description | DR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER. |
| QA Service Level | 1 (Verified on 03/26/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| clayton.malmberg@dot.ca.gov | Clayton Malmberg | Resident Engineer | Caltrans RE DB |
| brian.cinkutis@dot.ca.gov | Brian Cinkutis | Structural Representative | Caltrans SR DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 178 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-04-40 | 09/04/2025 | 09/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-09-04-39 | 09/04/2025 | 09/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-09-04-37 | 09/04/2025 | 09/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-09-02-2 | 09/02/2025 | 09/02/2025 | Quality Assurance | Concrete | View |
| 2025-09-02-1 | 09/02/2025 | 09/02/2025 | Quality Assurance | Concrete | View |
| 2025-08-27-21 | 08/27/2025 | 08/28/2025 | Quality Assurance | Concrete | View |
| 2025-08-27-20 | 08/27/2025 | 08/05/2025 | Quality Assurance | Concrete | View |
| 2025-08-18-28 | 08/18/2025 | 08/18/2025 | Quality Assurance | Aggregate | View |
| 2025-08-18-27 | 08/18/2025 | 08/18/2025 | Quality Assurance | Aggregate | View |
| 2025-08-18-14 | 08/18/2025 | 08/05/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
