Project Details
This page displays current information for project DEA: 07333004.
Project Information
| Project Identifiers | Project ID: 215314 DEA: 07333004 EFIS: 0716000298 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5,5-15.1/22.9 |
| Award Date | 10/20/2022 |
| Closeout Date | 08/20/2025 |
| Work Description | PROJECT PILOT 1 |
| Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES ON ROUTE 5 FROM 0.1 MILE SOUTH OF CALZONA STREET TO 0.1 MILE SOUTH OF RIVERSIDE DRIVE AND ROUTE 2 AT LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER |
| QA Service Level | 1 (Verified on 07/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jerome.g.arabe@dot.ca.gov | Jerome Arabe | Resident Engineer | Caltrans RE DB |
| gon.choi@bureauveritas.com | Gon Choi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 75 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-03-15-6 | 03/15/2024 | 03/15/2024 | Department Acceptance | Aggregate | View |
| 2024-03-15-5 | 03/15/2024 | 03/15/2024 | Department Acceptance | Aggregate | View |
| 2024-03-15-4 | 03/15/2024 | 03/15/2024 | Department Acceptance | Aggregate | View |
| 2024-03-04-3 | 03/04/2024 | 03/04/2024 | Department Acceptance | Aggregate | View |
| 2024-01-26-46 | 01/26/2024 | 01/27/2024 | Quality Control | Concrete | View |
| 2024-01-19-34 | 01/19/2024 | 01/20/2024 | Quality Control | Concrete | View |
| 2024-02-15-10 | 02/15/2024 | 02/15/2024 | Department Acceptance | Soil | View |
| 2024-02-14-2 | 02/14/2024 | 02/14/2024 | Department Acceptance | Soil | View |
| 2024-01-26-39 | 01/26/2024 | 01/26/2024 | Quality Control | Aggregate | View |
| 2023-11-30-73 | 11/30/2023 | 12/01/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
