Project Details
This page displays current information for project DEA: 101C1704.
Project Information
| Project Identifiers | Project ID: 215183 DEA: 101C1704 EFIS: 1014000144 |
|---|---|
| DIST-CO-RTE-PM | 10-MER-99-R12.7/17.8 |
| Award Date | 01/22/2021 |
| Closeout Date | Not set |
| Work Description | RECONSTRUCT ROADWAY WITH ROADWAY EXCAVATION, PLACE HMA AND CRCP. |
| Location Description | MERCED COUNTY IN MERCED FROM 0.2 MILE SOUTH OF CHILDS AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF FRANKLIN ROAD OVERCROSSING. |
| QA Service Level | 1 (Verified on 10/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| wali.waziri@dot.ca.gov | Wali Waziri | Resident Engineer | Caltrans RE DB |
| george.samuel@dot.ca.gov | George Samuel | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 98 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-06-22-80 | 06/22/2023 | 06/22/2023 | Quality Control | Concrete | View |
| 2023-06-16-71 | 06/16/2023 | 06/16/2023 | Quality Control | Concrete | View |
| 2023-06-16-70 | 06/16/2023 | 06/17/2023 | Quality Control | Aggregate | View |
| 2023-06-16-69 | 06/16/2023 | 06/17/2023 | Quality Control | Aggregate | View |
| 2023-06-16-68 | 06/16/2023 | 06/17/2023 | Quality Control | Aggregate | View |
| 2023-06-12-78 | 06/12/2023 | 06/12/2023 | Quality Control | Concrete | View |
| 2023-06-12-77 | 06/12/2023 | 06/13/2023 | Quality Control | Aggregate | View |
| 2023-06-12-76 | 06/12/2023 | 06/13/2023 | Quality Control | Aggregate | View |
| 2023-06-12-75 | 06/12/2023 | 06/13/2023 | Quality Control | Aggregate | View |
| 2023-11-06-46 | 11/06/2023 | 11/06/2023 | Department Acceptance | Roadway/Bridge Surface | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
