Project Details
This page displays current information for project DEA: 042J7204.
Project Information
| Project Identifiers | Project ID: 214640 DEA: 042J7204 EFIS: 0415000016 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-580-1.17 |
| Award Date | 02/25/2021 |
| Closeout Date | 12/01/2023 |
| Work Description | STEGE DRAIN SUPER-STRUCTURE, PRECAST VOIDED SLABS |
| Location Description | CONTRA COSTA COUNTY IN RICHMOND FROM 0.3 MILE EAST OF STEGE DRAIN BRIDGE TO 0.3 MILE WEST OF BAYVIEW AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 01/27/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| luistrc.melendez@dot.ca.gov | Luis Melendez | Resident Engineer | Caltrans RE DB |
| laraine.woo@dot.ca.gov | Laraine Woo | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 88 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-04-24-19 | 04/24/2023 | 04/25/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-04-12-2 | 04/12/2023 | 04/13/2023 | Department Acceptance | Roadway/Bridge Surface | View |
| 2022-12-15-43 | 12/15/2022 | 12/16/2022 | Annual Source Testing | Aggregate | View |
| 2022-12-12-21 | 12/12/2022 | 12/16/2022 | Annual Source Testing | Aggregate | View |
| 2022-10-18-45 | 10/18/2022 | 10/18/2022 | Quality Control | Concrete | View |
| 2022-10-18-44 | 10/18/2022 | 10/18/2022 | Quality Control | Aggregate | View |
| 2022-10-18-43 | 10/18/2022 | 10/18/2022 | Quality Control | Aggregate | View |
| 2022-10-12-43 | 10/12/2022 | 10/12/2022 | Quality Control | Concrete | View |
| 2022-10-12-42 | 10/12/2022 | 10/12/2022 | Quality Control | Concrete | View |
| 2022-10-12-41 | 10/12/2022 | 10/12/2022 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
