Project Details
This page displays current information for project DEA: 05344904.
Project Information
| Project Identifiers | Project ID: 214627 DEA: 05344904 EFIS: 0500000505 |
|---|---|
| DIST-CO-RTE-PM | 05-SBT-156-3/R8.2 |
| Award Date | 05/19/2022 |
| Closeout Date | Not set |
| Work Description | SAN BENITO ROUTE 156 IMPROVEMENT PROJECT SAN BENITO RTE 156 IMPROVEMENT PROJECT; INCLUDES NEW BRIDGE AND WIDENING OF EXISTING BRIDGE. |
| Location Description | SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 |
| QA Service Level | 1 (Verified on 01/14/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| farrukh.sana@dot.ca.gov | Frank (Farrukh) Sana | Resident Engineer | Caltrans RE DB |
| neil.weller@dot.ca.gov | Neil Weller | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 152 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-06-11-91 | 06/11/2024 | 06/21/2024 | Verification | Asphaltic Emulsion | View |
| 2024-06-10-93 | 06/10/2024 | 06/21/2024 | Verification | Asphaltic Emulsion | View |
| 2024-05-01-63 | 05/01/2024 | 05/01/2024 | Quality Control | Concrete | View |
| 2024-05-01-62 | 05/01/2024 | 05/02/2024 | Quality Control | Aggregate | View |
| 2024-05-01-61 | 05/01/2024 | 05/02/2024 | Quality Control | Aggregate | View |
| 2024-04-30-39 | 04/30/2024 | 04/30/2024 | Quality Control | Concrete | View |
| 2024-04-30-38 | 04/30/2024 | 05/01/2024 | Quality Control | Aggregate | View |
| 2024-04-30-37 | 04/30/2024 | 05/01/2024 | Quality Control | Aggregate | View |
| 2024-04-29-51 | 04/29/2024 | 04/29/2024 | Quality Control | Concrete | View |
| 2024-04-29-50 | 04/29/2024 | 04/30/2024 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
