Project Details
This page displays current information for project DEA: 043G4744.
Project Information
| Project Identifiers | Project ID: 214590 DEA: 043G4744 EFIS: 0412000074 |
|---|---|
| DIST-CO-RTE-PM | 04-MRN,MRN-580-6.9/7.8,0.0/2.5 |
| Award Date | 01/14/2021 |
| Closeout Date | 08/19/2024 |
| Work Description | CLEAN AND PAINT STRUCTURAL STEEL BRIDGE. |
| Location Description | CONTRA COSTA AND MARIN COUNTIES IN RICHMOND AND SAN RAFAEL FROM 0.8 MILE WEST OF TOLL PLAZA TO 0.1 MILE EAST OF MAIN STREET |
| QA Service Level | 1 (Verified on 02/18/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| behzad.halali@dot.ca.gov | Behzad Halali | Resident Engineer | Caltrans RE DB |
| william.sommer@dot.ca.gov | William Sommer | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 44 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-04-10-52 | 04/10/2023 | 04/10/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2023-04-05-29 | 04/05/2023 | 04/12/2023 | Quality Assurance | Concrete | View |
| 2023-04-06-14 | 04/06/2023 | Quality Assurance | Rapid Set | View | |
| 2023-04-06-13 | 04/06/2023 | 04/11/2023 | Quality Assurance | Rapid Set | View |
| 2023-03-08-56 | 03/08/2023 | 03/08/2023 | Quality Assurance | Aggregate | View |
| 2023-02-07-33 | 02/07/2023 | 02/22/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2023-02-07-32 | 02/07/2023 | 02/22/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2023-02-07-31 | 02/07/2023 | 02/22/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2023-02-07-30 | 02/07/2023 | 02/22/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2023-02-07-29 | 02/07/2023 | 02/22/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
