Project Details
This page displays current information for project DEA: 080F0304.
Project Information
| Project Identifiers | Project ID: 213764 DEA: 080F0304 EFIS: 0800020358 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-60-R0.7/R3.0 |
| Award Date | 03/07/2019 |
| Closeout Date | 07/27/2023 |
| Work Description | REMOVE AND REPLACE THREE OVERCROSSING BRIDGES ON ROUTE 60 |
| Location Description | IN SAN BERNARDINO COUNTY IN AND NEAR CHINO AT VARIOUS LOCATIONS FROM O.1 MILE WEST OF PIPELINE AVENUE OVERCROSSING TO 0.1 MILE EAST OF BENSON AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 05/01/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| joseph.lopez@dot.ca.gov | Joseph Lopez | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 102 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-12-08-16 | 12/08/2020 | 12/09/2020 | Department Acceptance | Hot Mix Asphalt | View |
| 2021-01-14-15 | 01/14/2021 | 01/19/2021 | Quality Assurance | Concrete | View |
| 2020-12-17-4 | 12/17/2020 | 12/24/2020 | Quality Assurance | Concrete | View |
| 2020-12-17-3 | 12/17/2020 | 12/24/2020 | Quality Assurance | Concrete | View |
| 2020-12-08-8 | 12/08/2020 | 12/09/2020 | Department Acceptance | Hot Mix Asphalt | View |
| 2020-11-18-32 | 11/18/2020 | 12/12/2020 | Quality Assurance | Concrete | View |
| 2020-11-18-31 | 11/18/2020 | 12/12/2020 | Quality Assurance | Concrete | View |
| 2020-11-13-9 | 11/13/2020 | 11/18/2020 | Quality Assurance | Concrete | View |
| 2020-11-18-17 | 11/18/2020 | 11/23/2020 | Quality Assurance | Concrete | View |
| 2020-10-18-15 | 10/18/2020 | 11/23/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
