Project Details
This page displays current information for project DEA: 030F3514.
Project Information
Project Identifiers | Project ID: 212726 DEA: 030F3514 EFIS: 0316000080 |
---|---|
DIST-CO-RTE-PM | 03-SAC-51,99-VAR |
Award Date | 02/08/2018 |
Closeout Date | 12/08/2021 |
Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT AND MODIFY ELECTRICAL SYSTEM; SOLDIER PILES; CONCRETE RETAINING WALL |
Location Description | SACRAMENTO COUNTY FROM 0.5 MILE SOUTH OF COSUMNES RIVER BOULEVARD TO 0.2 MILE EAST OF ARDEN WAY UNDERCROSSING |
QA Service Level | 1 (Verified on 04/02/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
brent.bullard@dot.ca.gov | Brent Bullard | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 43 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-09-27-10 | 09/27/2018 | 09/28/2018 | Quality Assurance | Concrete | View |
2018-09-21-8 | 09/21/2018 | 09/25/2018 | Quality Assurance | Concrete | View |
2018-09-17-8 | 09/17/2018 | 09/19/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-09-17-9 | 09/17/2018 | 09/19/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-09-13-3 | 09/13/2018 | 09/17/2018 | Quality Assurance | Concrete | View |
2018-09-12-9 | 09/12/2018 | 09/20/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-09-07-2 | 09/07/2018 | 09/10/2018 | Quality Assurance | Concrete | View |
2018-09-07-3 | 09/07/2018 | 09/10/2018 | Quality Assurance | Concrete | View |
2018-09-07-4 | 09/07/2018 | 09/10/2018 | Quality Assurance | Concrete | View |
2018-08-31-2 | 08/31/2018 | 09/04/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods