Project Details
This page displays current information for project DEA: 051F79A4.
Project Information
| Project Identifiers | Project ID: 212571 DEA: 051F79A4 EFIS: 0514000061 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-55.9/R56.2 |
| Award Date | 09/13/2022 |
| Closeout Date | Not set |
| Work Description | Nojoqui Creek Bridge (51-0018 L/R) widening and rail replacement. |
| Location Description | IN SANTA BARBARA COUNTY NEAR BUELLTON AT NOJOQUI CREEK BRIDGE (BR #51-0018 L/R) |
| QA Service Level | 1 (Verified on 02/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| david.cooper@dot.ca.gov | David Cooper | Resident Engineer | Caltrans RE DB |
| sal.heredia@dot.ca.gov | Sal Heredia | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-22 of 22 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2017-07-01-2 | 07/01/2017 | 07/13/2017 | Quality Control | Soil | View |
| 2017-07-01-1 | 07/01/2017 | 07/13/2017 | Quality Control | Soil | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
