Project Details
This page displays current information for project DEA: 053307A4.
Project Information
| Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
| Award Date | 02/16/2022 |
| Closeout Date | 09/02/2025 |
| Work Description | Cholame Segment |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| andrew.borrelli@dot.ca.gov | Andrew Borrelli | Resident Engineer | Caltrans RE DB |
| david.lewis@dot.ca.gov | Dave Lewis | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 1433 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-30-44 | 08/30/2024 | 08/31/2024 | Quality Control | Concrete | View |
| 2024-08-30-42 | 08/30/2024 | 08/31/2024 | Acceptance | Concrete | View |
| 2024-08-09-109 | 08/09/2024 | 09/27/2024 | Dispute Resolution | Hot Mix Asphalt | View |
| 2024-08-09-108 | 08/09/2024 | 09/27/2024 | Dispute Resolution | Hot Mix Asphalt | View |
| 2024-09-03-61 | 09/03/2024 | 09/25/2024 | Dispute Resolution | Hot Mix Asphalt | View |
| 2024-08-13-143 | 08/13/2024 | 09/23/2024 | Dispute Resolution | Hot Mix Asphalt | View |
| 2024-08-13-142 | 08/13/2024 | 09/23/2024 | Dispute Resolution | Hot Mix Asphalt | View |
| 2024-08-13-141 | 08/13/2024 | 09/23/2024 | Dispute Resolution | Hot Mix Asphalt | View |
| 2024-08-13-131 | 08/13/2024 | 08/14/2024 | Quality Control | Concrete | View |
| 2024-08-13-128 | 08/13/2024 | 08/14/2024 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
