Project Details
This page displays current information for project DEA: 112T2174.
Project Information
| Project Identifiers | Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5-R37.4 - R46.5 |
| Award Date | 12/22/2016 |
| Closeout Date | Not set |
| Work Description | (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. |
| Location Description | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING |
| QA Service Level | 1 (Verified on 01/31/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| steve.mcmillan@dot.ca.gov | Steve McMillan | Resident Engineer | Caltrans RE DB |
| phong.t.le@dot.ca.gov | Phong Le | Structural Representative | Caltrans SR DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 237 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-09-30-1 | 09/30/2020 | 10/05/2020 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2020-09-21-1 | 09/21/2020 | 09/23/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2020-09-16-4 | 09/16/2020 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2020-09-16-3 | 09/16/2020 | 09/22/2020 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2020-09-16-2 | 09/16/2020 | 09/17/2020 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2020-09-16-1 | 09/16/2020 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2020-09-14-2 | 09/14/2020 | 09/16/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2020-09-14-1 | 09/14/2020 | Quality Control | SMTL TM5 - Couplers | View | |
| 2020-09-09-2 | 09/09/2020 | 09/11/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2020-09-09-1 | 09/09/2020 | 09/11/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
