Project Details
This page displays current information for project DEA: 061A7604.
Project Information
| Project Identifiers | Project ID: 1001439 DEA: 061A7604 EFIS: 0621000015 COOP: NONE |
|---|---|
| DIST-CO-RTE-PM | 06-KER-46-51.4/R57.9 |
| Award Date | 10/20/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC PAVEMENT, RHMA OVERLAY, CONC. BARRIER AND RUMBLE STRIPS. |
| Location Description | KERN COUNTY IN AND NEAR WASCO FROM 0.20 MILE EAST OF ROUTE 43 TO 0.30 MILE EAST OF ROUTE 46/99 SEPARATION |
| QA Service Level | 1 (Verified on 08/15/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| alejandro.ruezga@dot.ca.gov | Alejandro Ruezga | Resident Engineer | Caltrans RE DB |
| ivan.cruz@dot.ca.gov | Ivan Cruz | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 55 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-06-03-36 | 06/03/2026 | 06/04/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-06-03-28 | 06/03/2026 | 06/04/2026 | Acceptance | Aggregate | View |
| 2026-06-03-27 | 06/03/2026 | 06/04/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-06-03-26 | 06/03/2026 | 06/04/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-06-03-25 | 06/03/2026 | 06/04/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-06-02-36 | 06/02/2026 | 06/03/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-06-02-34 | 06/02/2026 | 06/03/2026 | Acceptance | Aggregate | View |
| 2026-06-02-33 | 06/02/2026 | 06/03/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-06-02-32 | 06/02/2026 | 06/03/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-06-02-31 | 06/02/2026 | 06/03/2026 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
