Project Details
This page displays current information for project DEA: 081N7704.
Project Information
| Project Identifiers | Project ID: 1001001 DEA: 081N7704 EFIS: 0823000047 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-173-L0.0/L7.7 |
| Award Date | 04/25/2025 |
| Closeout Date | 07/23/2026 |
| Work Description | COLD PLANE AC PVMT, HMA (TYPE A), AND REPLACE AC SURFACING. |
| Location Description | SAN BERNARDINO COUNTY IN HESPERIA FROM ROUTE 138 TO 0.5 MILE EAST OF ARROWHEAD LAKE ROAD |
| QA Service Level | 1 (Verified on 04/07/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 21-30 of 35 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-05-48 | 08/05/2025 | 08/07/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-06-45 | 08/06/2025 | 08/08/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-08-05-41 | 08/05/2025 | 08/06/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-08-06-42 | 08/06/2025 | 08/08/2025 | Verification | Aggregate | View |
| 2025-08-05-35 | 08/05/2025 | 08/06/2025 | Verification | Aggregate | View |
| 2025-07-10-97 | 07/10/2025 | 08/05/2025 | Verification | Aggregate | View |
| 2025-07-10-76 | 07/10/2025 | 07/22/2025 | Verification | Asphalt Binder | View |
| 2025-07-10-75 | 07/10/2025 | 07/22/2025 | Verification | Aggregate | View |
| 2025-07-10-74 | 07/10/2025 | 07/22/2025 | Verification | Hot Mix Asphalt | View |
| 2025-07-10-71 | 07/10/2025 | 07/21/2025 | Verification | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods