Project Details
This page displays current information for project DEA: 11430324.
Project Information
| Project Identifiers | Project ID: 1000320 DEA: 11430324 EFIS: 1118000102 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-14.6/23.7 |
| Award Date | 08/23/2024 |
| Closeout Date | Not set |
| Work Description | MODIFY ELECTRICAL, CONCRETE PAVEMENT, DRAINAGE AND SIGNS. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/15 SEPARATION TO 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION |
| QA Service Level | 1 (Verified on 09/09/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| arashdeep.pannu@dot.ca.gov | Art Pannu | Resident Engineer | Caltrans RE DB |
| anh.v.ma@dot.ca.gov | Anh Ma | Structural Representative | Caltrans SR DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 80 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-18-110 | 06/18/2025 | 06/19/2025 | Quality Assurance | Aggregate | View |
| 2025-06-03-92 | 06/03/2025 | 06/04/2025 | Quality Assurance | Aggregate | View |
| 2025-05-02-14 | 05/02/2025 | 05/02/2025 | Quality Assurance | Aggregate | View |
| 2025-05-01-8 | 05/01/2025 | 05/01/2025 | Quality Assurance | Aggregate | View |
| 2025-04-30-20 | 04/30/2025 | 04/30/2025 | Quality Assurance | Aggregate | View |
| 2025-04-29-36 | 04/29/2025 | 04/29/2025 | Quality Assurance | Aggregate | View |
| 2025-04-08-17 | 04/08/2025 | 04/09/2025 | Quality Assurance | Aggregate | View |
| 2025-04-09-3 | 04/09/2025 | 04/09/2025 | Quality Assurance | Aggregate | View |
| 2025-03-26-44 | 03/26/2025 | 04/07/2025 | Quality Assurance | Aggregate | View |
| 2025-04-03-45 | 04/03/2025 | 04/08/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
