Project Details
This page displays current information for project DEA: 07333704.
Project Information
| Project Identifiers | Project ID: 1000301 DEA: 07333704 EFIS: 0716000316 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-138-43.4/51.4 |
| Award Date | 07/30/2024 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT ADA CURB RAMPS, SIDEWALK, AND DRIVEWAY. |
| Location Description | LOS ANGELES COUNTY IN PALMDALE FROM ROUTE 14 JUNCTION (SOUTH) TO AVENUE T |
| QA Service Level | 1 (Verified on 08/12/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| roberto.martinez@dot.ca.gov | Roberto Martinez | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 38 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-18-17 | 06/18/2025 | 06/18/2025 | Acceptance | Soil | View |
| 2025-06-18-16 | 06/18/2025 | 06/18/2025 | Acceptance | Soil | View |
| 2025-06-04-20 | 06/04/2025 | 06/04/2025 | Quality Assurance | Soil | View |
| 2025-05-28-16 | 05/28/2025 | 05/28/2025 | Acceptance | Soil | View |
| 2025-05-28-15 | 05/28/2025 | 05/28/2025 | Acceptance | Soil | View |
| 2025-05-08-8 | 05/08/2025 | 05/08/2025 | Acceptance | Soil | View |
| 2025-02-21-40 | 02/21/2025 | 03/24/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-02-21-39 | 02/21/2025 | 03/24/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-02-05-27 | 02/05/2025 | 02/06/2025 | Quality Control | Concrete | View |
| 2025-02-05-26 | 02/05/2025 | 02/06/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
