Project Details
This page displays current information for project DEA: 060S0504.
Project Information
| Project Identifiers | Project ID: 1000300 DEA: 060S0504 EFIS: 0615000047 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-166-17.5 |
| Award Date | 08/23/2024 |
| Closeout Date | Not set |
| Work Description | MICROPILING, STRUCTURAL CONCRETE, AND HOT MIX ASPHALT (TYPE A). |
| Location Description | KERN COUNTY NEAR METTLER AT CALIFORNIA AQUEDUCT BRIDGE |
| QA Service Level | 1 (Verified on 05/06/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| james.burford@dot.ca.gov | James Burford | Resident Engineer | Caltrans RE DB |
| albert.x.heredia@dot.ca.gov | Albert Heredia | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 37 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-12-17 | 11/12/2025 | 11/12/2025 | Acceptance | Soil | View |
| 2025-11-12-16 | 11/12/2025 | 11/12/2025 | Acceptance | Soil | View |
| 2025-11-07-8 | 11/07/2025 | 11/07/2025 | Acceptance | Soil | View |
| 2025-11-06-21 | 11/06/2025 | 11/06/2025 | Acceptance | Soil | View |
| 2025-11-06-20 | 11/06/2025 | 11/06/2025 | Acceptance | Soil | View |
| 2025-11-06-19 | 11/06/2025 | 11/06/2025 | Acceptance | Soil | View |
| 2025-11-06-18 | 11/06/2025 | 11/06/2025 | Acceptance | Soil | View |
| 2025-10-30-41 | 10/30/2025 | 10/30/2025 | Acceptance | Concrete | View |
| 2025-11-05-13 | 11/05/2025 | 11/05/2025 | Acceptance | Soil | View |
| 2025-10-21-36 | 10/21/2025 | 10/23/2025 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
