Project Details
This page displays current information for project DEA: 081H0604.
Project Information
| Project Identifiers | Project ID: 994328 DEA: 081H0604 EFIS: 0816000130 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-34.3/45.1 |
| Award Date | 04/03/2023 |
| Closeout Date | 08/26/2025 |
| Work Description | FIBER OPTIC CABLE SYSTEMS, RHMA, HMA, AND MINOR CONCRETE. |
| Location Description | RIVERSIDE COUNTY IN AND NEAR HEMET FROM WINCHESTER ROAD TO FAIRVIEW AVENUE |
| QA Service Level | 1 (Verified on 08/28/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| omar.sanchez@dot.ca.gov | Omar Sanchez | Resident Engineer | Caltrans RE DB |
| arnel.vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 241-250 of 339 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-13-8 | 09/13/2024 | 09/13/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-11-2 | 09/11/2024 | 09/11/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-09-18 | 09/09/2024 | 09/10/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-10-1 | 09/10/2024 | 09/10/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-26-59 | 08/26/2024 | 08/27/2024 | Verification | Asphalt Binder | View |
| 2024-08-26-45 | 08/26/2024 | 08/27/2024 | Verification | Asphalt Rubber Binder | View |
| 2024-08-26-13 | 08/26/2024 | 08/27/2024 | Production Start-Up | Hot Mix Asphalt | View |
| 2024-08-26-12 | 08/26/2024 | 08/27/2024 | Verification | Aggregate | View |
| 2024-08-19-1 | 08/19/2024 | 08/19/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-16-1 | 08/16/2024 | 08/16/2024 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
