Project Details
This page displays current information for project DEA: 081G6404.
Project Information
| Project Identifiers | Project ID: 995059 DEA: 081G6404 EFIS: 0816000046 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-395-R4.0/49.0 |
| Award Date | 10/25/2023 |
| Closeout Date | Not set |
| Work Description | REPLACE ASPHALT CONCRETE SURFACING, COLD PLANE AC PVMT AND RHMA. |
| Location Description | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS FROM ROUTE 15/395 SEPARATION TO 3.1 MILES NORTH OF ROUTE 58/395 SEPARATION |
| QA Service Level | 1 (Verified on 08/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| shaun.loza@dot.ca.gov | Shaun Loza | Resident Engineer | Caltrans RE DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 231-240 of 353 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-06-27-123 | 06/27/2024 | 06/28/2024 | Acceptance | Aggregate | View |
| 2024-06-27-122 | 06/27/2024 | 06/27/2024 | Acceptance | Aggregate | View |
| 2024-06-26-135 | 06/26/2024 | 06/27/2024 | Acceptance | Aggregate | View |
| 2024-06-26-134 | 06/26/2024 | 06/26/2024 | Acceptance | Aggregate | View |
| 2024-06-25-140 | 06/25/2024 | 06/26/2024 | Acceptance | Aggregate | View |
| 2024-06-25-139 | 06/25/2024 | 06/25/2024 | Acceptance | Aggregate | View |
| 2024-06-24-132 | 06/24/2024 | 06/25/2024 | Acceptance | Aggregate | View |
| 2024-06-22-15 | 06/22/2024 | 06/22/2024 | Acceptance | Aggregate | View |
| 2024-06-21-98 | 06/21/2024 | 06/22/2024 | Acceptance | Aggregate | View |
| 2024-06-19-153 | 06/19/2024 | 06/20/2024 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
