Project Details
This page displays current information for project DEA: 120J34U4.
Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| vvaldovinos@fountainheadcorp.com | Victor Valdovinos | Resident Engineer | Caltrans RE DB |
| Yong.Gyun.Park@dot.ca.gov | Yong Gyun Park | Structural Representative | Caltrans SR DB |
| eric.tsang@dot.ca.gov | Eric Tsang | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 211-220 of 1647 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-06-102 | 11/06/2025 | 11/07/2025 | Quality Control | Concrete | View |
| 2025-10-29-64 | 10/29/2025 | 10/30/2025 | Quality Control | Concrete | View |
| 2025-10-22-73 | 10/22/2025 | 10/23/2025 | Quality Control | Concrete | View |
| 2025-10-01-97 | 10/01/2025 | 10/02/2025 | Quality Control | Concrete | View |
| 2025-09-16-126 | 09/16/2025 | 08/17/2025 | Quality Control | Concrete | View |
| 2025-12-03-71 | 12/03/2025 | 12/03/2025 | Quality Control | Precast Concrete | View |
| 2025-11-06-101 | 11/06/2025 | 11/07/2025 | Quality Control | Aggregate | View |
| 2025-10-29-63 | 10/29/2025 | 10/30/2025 | Quality Control | Aggregate | View |
| 2025-10-22-72 | 10/22/2025 | 10/23/2025 | Quality Control | Aggregate | View |
| 2025-10-01-96 | 10/01/2025 | 10/02/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
