Project Details
This page displays current information for project DEA: 07303704.
Project Information
| Project Identifiers | Project ID: 214451 DEA: 07303704 EFIS: 0714000035 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-8.0/27.3 |
| Award Date | 12/19/2019 |
| Closeout Date | 05/07/2024 |
| Work Description | REPLACE CONCRETE BARRIERS. |
| Location Description | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 08/12/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kevin.bui@dot.ca.gov | Kevin Bui | Resident Engineer | Caltrans RE DB |
| kwangsuk.suh@dot.ca.gov | Kwangsuk Suh | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 201-210 of 245 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-03-16-9 | 03/16/2022 | 03/17/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-03-15-12 | 03/15/2022 | 03/15/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-03-14-22 | 03/14/2022 | 03/15/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-03-09-13 | 03/09/2022 | 03/09/2022 | Quality Assurance | Soil | View |
| 2022-02-25-9 | 02/25/2022 | 02/25/2022 | Quality Assurance | Soil | View |
| 2022-02-07-40 | 02/07/2022 | 02/11/2022 | Department Acceptance | Aggregate | View |
| 2022-02-17-2 | 02/17/2022 | 02/17/2022 | Quality Assurance | Soil | View |
| 2022-01-27-34 | 01/27/2022 | 02/01/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-02-15-3 | 02/15/2022 | 02/15/2022 | Quality Assurance | Soil | View |
| 2022-02-09-5 | 02/09/2022 | 02/09/2022 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
