Project Details
This page displays current information for project DEA: 010J4104.
Project Information
Project Identifiers | Project ID: 994116 DEA: 010J4104 EFIS: 0119000025 |
---|---|
DIST-CO-RTE-PM | 01-HUM-299-30.7/33.4 |
Award Date | 11/23/2022 |
Closeout Date | Not set |
Work Description | Project Name: HUM-299 Curve Improvement |
Location Description | HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.1 MILE EAST OF CEDAR CREEK ROAD TO 0.1 MILE EAST OF EAST FORK WILLOW CREEK BRIDGE |
QA Service Level | 1 (Verified on 07/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ethan.retherford@dot.ca.gov | Ethan Retherford | Resident Engineer | Caltrans RE DB |
laura.cangas@dot.ca.gov | Laura Cangas | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 191-200 of 243 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-09-28-6 | 09/28/2023 | 09/28/2023 | Quality Control | Concrete | View |
2023-09-25-17 | 09/25/2023 | 09/25/2023 | Quality Control | Concrete | View |
2023-09-22-18 | 09/22/2023 | 09/22/2023 | Quality Control | Concrete | View |
2023-09-21-10 | 09/21/2023 | 09/21/2023 | Quality Control | Concrete | View |
2023-09-11-52 | 09/11/2023 | 09/11/2023 | Quality Control | Concrete | View |
2023-09-19-13 | 09/19/2023 | 09/19/2023 | Quality Control | Concrete | View |
2023-09-18-45 | 09/18/2023 | 09/18/2023 | Quality Control | Concrete | View |
2023-09-15-6 | 09/15/2023 | 09/15/2023 | Quality Control | Concrete | View |
2023-09-14-22 | 09/14/2023 | 09/14/2023 | Quality Control | Concrete | View |
2023-09-13-27 | 09/13/2023 | 09/13/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods